Wind Farm Array Cable Risk-Based Assessment And Analysis

Introduction A client approached us with concerns over the integrity of the cables on a large UK wind farm they operated. They intended to develop a risk-based inspection plan (RBI) and had a good library of data from performing route surveys of the cables. However, they needed to understand which cables were most at risk …

Wind Farm Array Cable Risk-Based Assessment And Analysis Read More »

Cable repair procedure risk assessment

The scope We were asked to assist in the technical evaluation, comparison and risk assessment of three vendor submissions for inter array cable repair procedures. The solution We reviewed and provided technical comment on procedures from each vendor. Procedures included: Inter array cable recovery Cable repair methods Cable pull-in methodology Burial equipment Burial methodology Cable …

Cable repair procedure risk assessment Read More »

Write a brief message, submit the form and Graham will be sent an email. 

* required

Write a brief message, submit the form and Sean will be sent an email. 

* required

Write a brief message, submit the form and John will be sent an email. 

* required

Write a brief message, submit the form and Grant will be sent an email. 

* required

Scroll to Top