Wind Farm Array Cable Risk-Based Assessment And Analysis
Introduction A client approached us with concerns over the integrity of the cables on a large UK wind farm they operated. They intended to develop a risk-based inspection plan (RBI) and had a good library of data from performing route surveys of the cables. However, they needed to understand which cables were most at risk …
Wind Farm Array Cable Risk-Based Assessment And Analysis Read More »