Overview

With typical costs of $200,000 per day, installation vessel time needs to be carefully planned in advance. Many of the new entrants to this market do not have in-house capacity to perform installation analysis and so come to companies like Jee for specialist assistance.

In recent months Jee has helped a number of companies to avoid costly mistakes during installation of subsea power cables, structures and flowlines. This webinar will show you some of the philosophy behind good analysis, some of the pitfalls and how you can avoid them using pragmatic reasoning.

The webinar will also demonstrate how installation analysis tools such as OrcaFlex can be used to generate safe operating tables for different activities.

Learning objectives

  • Gain an overview on the installation of subsea power cables, structures and flowlines
  • Insight into installation analysis tools such as OrcaFlex and the generation of safe operating tables
  • How to avoid pitfalls using pragmatic reasoning

Speakers

Rob Davies, Chartered Senior Subsea Engineer at Jee Ltd

Rob Davies is a subsea engineer with specific expertise in installation analysis. Rob has in-depth knowledge of installation analysis of subsea power cables, flexible risers, umbilicals and pipelines as a result of working on a wide range of projects, including three wind farm projects around the UKCS.

Please register using the form below to get the password.

Name(Required)
This field is for validation purposes and should be left unchanged.

Write a brief message, submit the form and Graham will be sent an email. 

* required

Write a brief message, submit the form and Sean will be sent an email. 

* required

Write a brief message, submit the form and John will be sent an email. 

* required

Write a brief message, submit the form and Grant will be sent an email. 

* required

Scroll to Top