• Engineering: +44 (0)1224 392 040    Training: +44 (0)1732 371 391
  • Library Login
  • british flag United Kingdom

Subsea Engineering and training experts
ENGINEERING
TALENT

Since 1988

Jee Star Logo Planning, executing and managing decommissioning projects in the North Sea

Planning, executing and managing decommissioning projects in the North Sea

About the course

This course provides delegates with a technical awareness of the approaches, issues and challenges associated with decommissioning in the North Sea.

Detailing the complete decommissioning process from beginning to end, this course will cover planning activities and considerations, well plugging and abandonment activities and approaches, approaches to the decommissioning of structures and pipelines and the associated onshore activities. In addition, given the current climate and the need to reduce the taxpayer contribution to decommissioning, innovation leading to cost saving approaches to decommissioning in this region will be considered and discussed.

Delivered by experienced facilitators, this course is suitable for anyone working in or interested in the decommissioning sector, and will develop your knowledge of the various stages of a decommissioning project and what is involved, including the applicable regulations and legislation.

Learning outcomes

  • Obtain the knowledge necessary for project readiness, enhancing your company’s ability to deliver successful decommissioning results
  • Gain an overview of North Sea decommissioning and an understanding of the applicable regulations and legislation in the region
  • Develop an appreciation of the key considerations to be made at each stage of a decommissioning project, including the planning process and the submission of the required documentation prior to commencement of the execution phase
  • Appreciate the benefits of collaboration and campaigning for your decommissioning projects, understand how collaboration can be applied and controlled throughout the project in accordance with BS 11000, and be able to identify potential pitfalls and the means of avoiding them
  • Understand the methodologies currently adopted for well plugging and abandonment and the decommissioning of offshore structures and pipelines
  • Gain an insight into emerging and transferable technologies, innovations and developments that could improve process efficiency and safety whilst reducing the costs associated with the decommissioning process

View course contents
course bar chart Level Technical Awareness
timer icon Duration 2 Days
clock Study Hours 14
Also available in house

About the Tutor

Graham Wilson
MEng (Hons) CEng MIMechE

Graham is Jee’s Head of Late Life and a chartered mechanical engineer with 10 years’ industry experience. He has particular expertise in design, integrity management, fishing interaction studies and verification.

Graham teaches Design of subsea pipelines, Advanced design including HP/HT and deepwater pipelines, Free spans and on-bottom stability and Planning, executing and managing decommissioning projects in the North Sea.
 

Jee Star Logo Planning, executing and managing decommissioning projects in the North Sea - course contents

Day 1

Overview of decommissioning in the North Sea

  • When is end of field life?
  • North Sea decommissioning commitment
  • Decommissioning forecasts
  • Collaboration and campaigning (clusters)
  • Learning from other sectors

Regulatory compliance

  • Role of the regulators
  • Decommissioning regulations and legislation
  • Required submissions prior to commencement of decommissioning operators
  • Application of regulations

Planning for decommissioning

  • Keep or sell decisions
  • Asset late life considerations
  • Portfolio planning and contracting strategy
  • Management of decommissioning projects
  • Financial and commercial planning, including estimation of liabilities
  • Sequencing
  • Stakeholder identification and management

Well plugging and abandonment

  • Platform / subsea well configuration
  • Plugging and abandonment methods
  • Challenges, costs and timing
  • Live well abandonment
  • New technology
  • Case studies

Day 2

Decommissioning of structures

  • Topsides facilities
  • Subsea structures
  • Platform jackets
  • Gravity based structures
  • Floating facilities
  • Case studies

Decommissioning of pipelines and ancillary components

  • Cleaning requirements and approaches
  • Removal options for rigid and flexible pipeline and riser sections
  • Mattresses and grout bags
  • Environmental considerations
  • Decommissioning in situ
  • Case studies

Onshore disposal

  • Transportation / load in
  • Onshore locations and capacity
  • Hazardous materials and permitting
  • Waste hierarchy
  • Re-use or recycling considerations
  • Landfill

Group exercise (completed following the course)

  • Devise the decommissioning programme for a North Sea field development, providing justification for the sequencing and approach adopted and outlining the considerations to be made at each stage of the process.
investors in people logo
iso 14001 logo FPAL logo UVDB logo

All Rights Reserved © Jee Ltd 2017