Jee Star Logo Wind farm array cable risk-based assessment and analysis

Wind farm array cable risk-based assessment and analysis

Scope of work

Our client, an operator of a large UK wind farm, asked us to conduct an array cable risk assessment as a first step towards developing an RBI (risk-based inspection) plan.

The operator had performed route surveys of the cables and had a good library of data, but needed to understand which cables were most at risk so that integrity management activities could be appropriately targeted.

The solution

We performed this study in two parts. The first was an OrcaFlex analysis of two cable bell-mouth spans and a mid-route span on the seabed. Worst-case scour profiles and span lengths were modelled, as well as a more representative, ‘average’, cable span arrangement. The results gave maximum tensions, MBRs and curvatures, and fed into the second part of the study, which was to rank each cable with a risk of spanning, exposure, and third party interaction. The high risk cables within the windfarm were then identified.

The benefits

We presented our client with indicative physical cable properties from modelled spans, as well as a table of risk-ranked cables. This combination allowed them to not only plan and prioritise their future survey and remedial activities, but also to present the results to the board, highlighting the importance of continued cable integrity management.

Wind farm array cable risk-based assessment and analysis

Can't find what you are looking for? Get in touch

Fill in our contact form fields marked with * are mandatory

Can't find what you are looking for? Get in touch

Fill in our contact form fields marked with * are manditory

investors in people logo
iso 14001 logo FPAL logo UVDB logo

All Rights Reserved © Jee Ltd 2019