• Engineering: +44 (0)1224 392 040    Training: +44 (0)1732 371 391
  • Libary Login
  • british flag United Kingdom

Subsea Engineering and training experts
CREATING SOLUTIONS
SHARING KNOWLEDGE

Since 1988

Jee Star Logo Case Studies


When we complete a project, we take great pride in sharing what we learnt and how we approached the task at hand, and we do this by creating our subsea engineering case studies. These highlight and showcase the work that we complete. It is important to have a sense of pride around the work that one completes and our case studies.

Access our resources on topics spanning the whole life-of-field.

Pipeline cleaning sequencing for decommissioning

Case Study

Pipeline cleaning sequencing for decommissioning

Isolation plug assurance review

Case Study

Isolation plug assurance review

Wind farm array cable risk-based assessment and analysis

Case Study

Wind farm array cable risk-based assessment and analysis

Seafastenings design

Case Study

Seafastenings design

North Sea CAPEX and OPEX study

Case Study

North Sea CAPEX and OPEX study

Oil export pipeline lifetime extension

Case Study

Oil export pipeline lifetime extension

Tie-in isolation issue remediation

Case Study

Tie-in isolation issue remediation

Lifetime extension assessment for a condensate pipeline

Case Study

Lifetime extension assessment for a condensate pipeline

Lifetime extension assessment for two pipeline networks

Case Study

Lifetime extension assessment for two pipeline networks

Cable span monitoring

Case Study

Cable span monitoring

Major accident prevention documents (MAPD)

Case Study

Major accident prevention documents (MAPD)

Riser caisson structural integrity

Case Study

Riser caisson structural integrity

Jacket marine growth assessment

Case Study

Jacket marine growth assessment

Verification of pipeline design

Case Study

Verification of pipeline design

Pigging valve design

Case Study

Pigging valve design

Analysis of isolation plug incident

Case Study

Analysis of isolation plug incident

Deepwater maintenance and de-sanding pigging

Case Study

Deepwater maintenance and de-sanding pigging

Lifetime extension assessment

Case Study

Lifetime extension assessment

Global operational support

Case Study

Global operational support

Verification and design of subsea risers

Case Study

Verification and design of subsea risers

 Pipeline Integrity Management Systems (PIMS)

Case Study

Pipeline Integrity Management Systems (PIMS)

PLEM conceptual design

Case Study

PLEM conceptual design

Decommissioning of a North Sea platform and subsea infrastructure

Case Study

Decommissioning of a North Sea platform and subsea infrastructure

Lifetime extension of flexible jumpers

Case Study

Lifetime extension of flexible jumpers

Long term integrity management and operations support

Case Study

Long term integrity management and operations support

Technical integrity assessment (TIA)

Case Study

Technical integrity assessment (TIA)

Pipeline freespan monitoring

Case Study

Pipeline freespan monitoring

Span and buckling assessment

Case Study

Span and buckling assessment

Cable repair procedure risk assessment

Case Study

Cable repair procedure risk assessment

ILI project management

Case Study

ILI project management

Sphering frequency review

Case Study

Sphering frequency review

Integrity management and technical support

Case Study

Integrity management and technical support

Overtrawlability trials of a subsea structure

Case Study

Overtrawlability trials of a subsea structure

Installation analysis for array cables

Case Study

Installation analysis for array cables

Certification of bundle design for Bureau Veritas

Case Study

Certification of bundle design for Bureau Veritas

Detailed design of a subsea tie-back

Case Study

Detailed design of a subsea tie-back

Can't find what you are looking for? Get in touch

Fill in our contact form fields marked with * are manditory

investors in people logo
iso 14001 logo FPAL logo UVDB logo

All Rights Reserved © Jee Ltd 2017