
| Home | ||
| About us | ||
| Consultancy | ||
| Renewables | ||
| Training | ||
| News | ||
| Case studies | ||
| Careers | ||
| FAQs | ||
| Contact us | ||
| Site map | ||
| Jee blog |
These included
The results were analysed to produce graphs of bending moment versus percentage SMYS in the wye pieces for each load case. This allowed our clients to cross-check against design bending moments for different systems enabling the wye pieces to be used for a variety of load conditions without the need for further analysis.
All case studies