Our client, a North Sea Operator, was evaluating the potential of one of its new fields. As part of this evaluation, our client needed to establish the anticipated flowline system configuration for tying the development back to an existing platform. This would allow the cost to be developed to an order of magnitude.

Platform and support vessel

The benefit to the client was to provide the concept design of the tie back and to identify any potential problems and make recommendations accordingly.  This would allow the client to cost and determine the viability of the project.

Specific objectives were to:

Pipesim was used to determine the diameter sizing of the pipe and sensitivity to surface roughness.  It was also used to determine possible susceptibility to slugging and insulation requirements needed to prevent wax and hydrate formation during flowing conditions.  A particular issue that was encountered was the drop in wellhead temperature over field life and resulting problems concerned with waxing and hydrate formation.

Temperature profile at three stages of field life

The results:


Jee, Hildenbrook House, The Slade, Tonbridge, Kent. TN9 1HR. United Kingdom
Tel +44 (0)1732 371371  Fax +44 (0)1732 361646
Web content management systems by Netsite Ltd
Public training courses
Can we help with your offshore training needs?
View our upcoming course dates.
Engineering
We can help with your subsea engineering challenges 
Read about our capabilities
Keep me posted
Keep up to date with all the latest information about Jee!
Click here to join our mailing list
Contact us
Need more information?  Call +44 (0) 1732 371 371